Industry & Mining · Electrical panel & board production
Zambia does not manufacture electrical panels and boards — the figure is 2 $ in 2026. The electrical engineering sector is limited to basic assembly; complex panels are imported. Key industrial hubs — Lusaka and Ndola — focus on mining and food processing. Zambia ranks 105 out of 197 globally. The lack of local production is offset by imports from China and South Africa, which dominate the electrical equipment market.
Data for 2026 · unit: $
Position
#105 / 197
Zambia world ranking
Country position on the scale from last to first place for this indicator.
ZM
#105
#197#1
Trend
Change over time
Change in indicator over the available period.
1
1950
1
1990
3
2000
2
2010
3
2020
2
2025
2
2026
Values — $
Comparison
Top countries by Electrical panel & board production
Where Zambia stands in the world ranking.
1
ESSpain
400 M
2
CNChina
30
2
USUSA
30
4
JPJapan
25
4
DEGermany
25
4
BRBrazil
25
7
CACanada
22
8
RURussia
20
Full world rankingarrow_forward
People also search for
Other pages of the reference by this indicator.
Frequently asked questions
Electrical panel & board production in Zambia — how much?
Based on 2026 data — 2 $. This is rank #105 out of 197 countries.
What is Zambia's rank by Electrical panel & board production?
Zambia ranks #105 out of 197 countries in the world ranking by «Electrical panel & board production».
How has Electrical panel & board production changed in Zambia?
Over the available period the indicator changed from 1 to 2 $.