Ecology · Radioactive waste volume

Radioactive waste volume in Turkey in 2026

Turkey produces no radioactive waste — the figure is 5 m³. In 2026 it ranked 147 out of 197. The reason is that Turkey still has no operating nuclear power plants. The first NPP, Akkuyu (built by Rosatom), has not yet reached full commercial operation. All radioactive materials are limited to medical and industrial sources, stored in specialised centres. Once the plant starts, the situation will change dramatically.

Data for 2026 · unit: m³
Position

Turkey world ranking

#147 / 197

Country position on the scale from last to first place for this indicator.

TR
#147
#197#1
Trend

Change over time

Change in indicator over the available period.

0
1950
80
1990
100
2000
0
2010
0
2020
5
2025
5
2026

Values — m³

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Radioactive waste volume in Turkey — how much?
Based on 2026 data — 5 m³. This is rank #147 out of 197 countries.
What is Turkey's rank by Radioactive waste volume?
Turkey ranks #147 out of 197 countries in the world ranking by «Radioactive waste volume».
How has Radioactive waste volume changed in Turkey?
Over the available period the indicator changed from 0 to 5 m³.