Energy · Solar power capacity

Solar power capacity in Tanzania in 2026

Tanzania's solar sector is in its infancy — installed capacity stands at 0 GW in 2026 (150th out of 197). Despite excellent insolation (up to 5.5 kWh/m²/day), large-scale plants are rare: only pilot projects exist in Dodoma and Arusha. High capital costs and weak transmission infrastructure are key barriers. In 2024, construction began on the first 50 MW utility-scale solar farm in the Mwanza region.

Data for 2026 · unit: GW
Position

Tanzania world ranking

#150 / 197

Country position on the scale from last to first place for this indicator.

TZ
#150
#197#1
Trend

Change over time

Change in indicator over the available period.

0.00
1990
0.05
2000
0.01
2010
0.00
2020
0.20
2025
0.00
2026

Values — GW

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Solar power capacity in Tanzania — how much?
Based on 2026 data — 0 GW. This is rank #150 out of 197 countries.
What is Tanzania's rank by Solar power capacity?
Tanzania ranks #150 out of 197 countries in the world ranking by «Solar power capacity».
How has Solar power capacity changed in Tanzania?
Over the available period the indicator changed from 0 to 0 GW.