Industry & Mining · High-voltage power cable production

High-voltage power cable production in Tanzania in 2026

Tanzania does not produce high-voltage power cables — in 2026 output was 0 km. The country ranks 79th out of 197. Energy infrastructure is developing slowly, and demand for high-voltage lines is met through imports.

Data for 2026 · unit: km
Position

Tanzania world ranking

#79 / 197

Country position on the scale from last to first place for this indicator.

TZ
#79
#197#1
Trend

Change over time

Change in indicator over the available period.

0
1950
0
1990
0
2000
5
2010
10
2020
0
2025
0
2026

Values — km

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

High-voltage power cable production in Tanzania — how much?
Based on 2026 data — 0 km. This is rank #79 out of 197 countries.
What is Tanzania's rank by High-voltage power cable production?
Tanzania ranks #79 out of 197 countries in the world ranking by «High-voltage power cable production».
How has High-voltage power cable production changed in Tanzania?
Over the available period the indicator changed from 0 to 0 km.