Energy · Bioenergy installed capacity
Tanzania's bioenergy installed capacity is 0.30 GW in 2026, ranking 52 out of 197. The country barely uses biomass for industrial power, despite vast sisal and sugarcane plantations in the Morogoro and Tanga regions that could fuel biogas plants.
Data for 2026 · unit: GW
Position
#52 / 197
Tanzania world ranking
Country position on the scale from last to first place for this indicator.
TZ
#52
#197#1
Trend
Change over time
Change in indicator over the available period.
0.02
1950
0.10
1990
0.20
2000
0.10
2010
0.20
2020
0.25
2025
0.30
2026
Values — GW
Comparison
Top countries by Bioenergy installed capacity
Where Tanzania stands in the world ranking.
1
CNChina
18.00
2
BRBrazil
15.00
3
USUSA
14.00
4
DEGermany
9.50
5
GBUnited Kingdom
5.80
6
SESweden
4.50
7
CACanada
4.10
8
AUAustralia
4.00
Full world rankingarrow_forward
People also search for
Other pages of the reference by this indicator.
Frequently asked questions
Bioenergy installed capacity in Tanzania — how much?
Based on 2026 data — 0.30 GW. This is rank #52 out of 197 countries.
What is Tanzania's rank by Bioenergy installed capacity?
Tanzania ranks #52 out of 197 countries in the world ranking by «Bioenergy installed capacity».
How has Bioenergy installed capacity changed in Tanzania?
Over the available period the indicator changed from 0.02 to 0.30 GW.