Energy · Hydropower generation

Hydropower generation in Nigeria in 2026

Nigeria's hydropower generation reached 6 TWh in 2026, ranking 60 out of 197 countries. The Niger and Benue rivers are harnessed for electricity: the Kainji and Jebba dams form the backbone of hydro generation, though seasonal water level fluctuations often constrain output.

Data for 2026 · unit: TWh
Position

Nigeria world ranking

#60 / 197

Country position on the scale from last to first place for this indicator.

NG
#60
#197#1
Trend

Change over time

Change in indicator over the available period.

0.5
1950
5.0
1990
5.5
2000
5.8
2010
6.0
2020
5.0
2025
6.0
2026

Values — TWh

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Hydropower generation in Nigeria — how much?
Based on 2026 data — 6 TWh. This is rank #60 out of 197 countries.
What is Nigeria's rank by Hydropower generation?
Nigeria ranks #60 out of 197 countries in the world ranking by «Hydropower generation».
How has Hydropower generation changed in Nigeria?
Over the available period the indicator changed from 0 to 6 TWh.