Industry & Mining · Asphalt (road) production

Asphalt (road) production in Nigeria in 2026

Nigeria produced no road asphalt in 2026 — the volume was 2 M tonnes. This is due to underdeveloped road infrastructure: the country has one of the lowest densities of paved roads in Africa. Most roads remain unpaved, and bitumen needed for asphalt is imported despite the country's own oil reserves. Major highway projects are still being implemented with foreign contractors.

Data for 2026 · unit: tonnes
Position

Nigeria world ranking

#29 / 197

Country position on the scale from last to first place for this indicator.

NG
#29
#197#1
Trend

Change over time

Change in indicator over the available period.

5 K
1950
2 M
1990
3 M
2000
5 M
2010
6 M
2020
1.9 M
2025
2 M
2026

Values — tonnes

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Asphalt (road) production in Nigeria — how much?
Based on 2026 data — 2 M tonnes. This is rank #29 out of 197 countries.
What is Nigeria's rank by Asphalt (road) production?
Nigeria ranks #29 out of 197 countries in the world ranking by «Asphalt (road) production».
How has Asphalt (road) production changed in Nigeria?
Over the available period the indicator changed from 0 to 2 M tonnes.