Energy · Green hydrogen production capacity

Green hydrogen production capacity in Niger in 2026

Niger produces no green hydrogen — capacity stands at 0.1 kt/yr in 2026, ranking 107 out of 197 countries. The zero figure reflects the general underdevelopment of the hydrogen industry in West Africa: stable surplus renewable capacity, which is absent in the country, is required to launch electrolysis. The potential is enormous — the Tenere desert could host solar farms, but for now all efforts are directed toward basic electrification.

Data for 2026 · unit: kt/yr
Position

Niger world ranking

#107 / 197

Country position on the scale from last to first place for this indicator.

NE
#107
#197#1
Converted
0.0003 ktper day
Trend

Change over time

Change in indicator over the available period.

0.0
2020
0.1
2025
0.1
2026

Values — kt/yr

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Green hydrogen production capacity in Niger — how much?
Based on 2026 data — 0.1 kt/yr. This is rank #107 out of 197 countries.
What is Niger's rank by Green hydrogen production capacity?
Niger ranks #107 out of 197 countries in the world ranking by «Green hydrogen production capacity».
How has Green hydrogen production capacity changed in Niger?
Over the available period the indicator changed from 0 to 0.1 kt/yr.