Energy · Hydropower installed capacity

Hydropower installed capacity in Malaysia in 2026

Malaysia's installed hydropower capacity in 2026 reached 6.50 GW. Major hydro plants are located in the states of Sarawak and Sabah on Borneo, where abundant rivers and mountainous terrain provide ideal conditions. The largest is the Bakun Dam with a capacity of 2.4 GW. The country ranks 28th out of 197 in this indicator.

Data for 2026 · unit: GW
Position

Malaysia world ranking

#28 / 197

Country position on the scale from last to first place for this indicator.

MY
#28
#197#1
Trend

Change over time

Change in indicator over the available period.

0.00
1950
1.20
1990
2.10
2000
3.80
2010
6.20
2020
5.00
2025
6.50
2026

Values — GW

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Hydropower installed capacity in Malaysia — how much?
Based on 2026 data — 6.50 GW. This is rank #28 out of 197 countries.
What is Malaysia's rank by Hydropower installed capacity?
Malaysia ranks #28 out of 197 countries in the world ranking by «Hydropower installed capacity».
How has Hydropower installed capacity changed in Malaysia?
Over the available period the indicator changed from 0 to 6.50 GW.