Energy · Bioenergy installed capacity

Bioenergy installed capacity in Malaysia in 2026

Malaysia's installed bioenergy capacity in 2026 was 0.40 GW. Despite the huge potential of palm oil waste — the country is the world's second-largest palm oil producer — the bioenergy sector remains underdeveloped. Key projects are located in Pahang and Johor. Malaysia ranks 48th out of 197 in bioenergy capacity.

Data for 2026 · unit: GW
Position

Malaysia world ranking

#48 / 197

Country position on the scale from last to first place for this indicator.

MY
#48
#197#1
Trend

Change over time

Change in indicator over the available period.

0.05
1950
0.20
1990
0.40
2000
0.10
2010
0.30
2020
1.00
2025
0.40
2026

Values — GW

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Bioenergy installed capacity in Malaysia — how much?
Based on 2026 data — 0.40 GW. This is rank #48 out of 197 countries.
What is Malaysia's rank by Bioenergy installed capacity?
Malaysia ranks #48 out of 197 countries in the world ranking by «Bioenergy installed capacity».
How has Bioenergy installed capacity changed in Malaysia?
Over the available period the indicator changed from 0.05 to 0.40 GW.