Energy · Bioenergy installed capacity
Bioenergy is virtually undeveloped in Madagascar: installed capacity in 2026 was 0.10 GW, ranking 100 out of 197. Traditional biomass (firewood, charcoal) dominates household use, but industrial power generation facilities are absent due to weak infrastructure and competition from hydropower.
Data for 2026 · unit: GW
Position
#100 / 197
Madagascar world ranking
Country position on the scale from last to first place for this indicator.
MG
#100
#197#1
Trend
Change over time
Change in indicator over the available period.
0.01
1950
0.03
1990
0.10
2000
0.05
2010
0.10
2020
0.09
2025
0.10
2026
Values — GW
Comparison
Top countries by Bioenergy installed capacity
Where Madagascar stands in the world ranking.
1
CNChina
18.00
2
BRBrazil
15.00
3
USUSA
14.00
4
DEGermany
9.50
5
GBUnited Kingdom
5.80
6
SESweden
4.50
7
CACanada
4.10
8
AUAustralia
4.00
Full world rankingarrow_forward
People also search for
Other pages of the reference by this indicator.
Frequently asked questions
Bioenergy installed capacity in Madagascar — how much?
Based on 2026 data — 0.10 GW. This is rank #100 out of 197 countries.
What is Madagascar's rank by Bioenergy installed capacity?
Madagascar ranks #100 out of 197 countries in the world ranking by «Bioenergy installed capacity».
How has Bioenergy installed capacity changed in Madagascar?
Over the available period the indicator changed from 0.01 to 0.10 GW.