Energy · Hydropower installed capacity
Kazakhstan's hydropower potential, concentrated on the turbulent rivers of the Tien Shan and Altai mountains, is only partially realized. In 2026, the country's installed hydropower capacity reached 2.90 GW. The largest cascades—the Shulbinsk and Bukhtarma hydroelectric plants on the Irtysh River—form the backbone of hydro generation, supplying energy to the eastern regions. By this measure, Kazakhstan ranks 51 out of 197 countries, lagging behind many but holding significant potential for future capacity expansion.
Data for 2026 · unit: GW
Position
#51 / 197
Kazakhstan world ranking
Country position on the scale from last to first place for this indicator.
KZ
#51
#197#1
Trend
Change over time
Change in indicator over the available period.
0.10
1950
2.20
1990
2.20
2000
2.60
2010
2.80
2020
3.00
2025
2.90
2026
Values — GW
Comparison
Top countries by Hydropower installed capacity
Where Kazakhstan stands in the world ranking.
1
CNChina
420.00
2
BRBrazil
109.00
3
CACanada
82.00
4
USUSA
80.00
5
INIndia
56.00
6
RURussia
52.00
7
JPJapan
50.50
8
NONorway
34.00
Full world rankingarrow_forward
People also search for
Other pages of the reference by this indicator.
Frequently asked questions
Hydropower installed capacity in Kazakhstan — how much?
Based on 2026 data — 2.90 GW. This is rank #51 out of 197 countries.
What is Kazakhstan's rank by Hydropower installed capacity?
Kazakhstan ranks #51 out of 197 countries in the world ranking by «Hydropower installed capacity».
How has Hydropower installed capacity changed in Kazakhstan?
Over the available period the indicator changed from 0 to 2.90 GW.