Industry & Mining · Precast concrete elements production

Precast concrete elements production in Cameroon in 2026

In 2026, Cameroon produced no precast concrete elements — the figure was 10 thousand m³. The country ranks 73 out of 197 globally. The absence of precast plants is due to the small scale of industrial construction: housing is built from local brick and cast-in-place concrete. Major projects, such as stadiums for the 2021 Africa Cup of Nations, used imported precast elements from China and Turkey. Domestic production is limited to simple concrete blocks and foundation slabs.

Data for 2026 · unit: thousand m³
Position

Cameroon world ranking

#73 / 197

Country position on the scale from last to first place for this indicator.

CM
#73
#197#1
Trend

Change over time

Change in indicator over the available period.

0
1950
15
1990
30
2000
25
2010
40
2020
10
2025
10
2026

Values — thousand m³

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Precast concrete elements production in Cameroon — how much?
Based on 2026 data — 10 thousand m³. This is rank #73 out of 197 countries.
What is Cameroon's rank by Precast concrete elements production?
Cameroon ranks #73 out of 197 countries in the world ranking by «Precast concrete elements production».
How has Precast concrete elements production changed in Cameroon?
Over the available period the indicator changed from 0 to 10 thousand m³.