Energy · Hydropower installed capacity

Hydropower installed capacity in Cameroon in 2026

Cameroon's hydropower installed capacity reaches 0.35 GW. In 2026, the country ranks 99 out of 197 globally. Hydropower is concentrated on the Sanaga River, home to the Edea (264 MW) and Song-Loulou (384 MW) plants. The mountainous terrain of the Western Highlands and heavy rainfall (up to 10,000 mm annually in the Littoral Province) provide ideal conditions for electricity generation. Cameroon continues to expand capacity: the 90 MW Nachtigal Dam was commissioned in 2024.

Data for 2026 · unit: GW
Position

Cameroon world ranking

#99 / 197

Country position on the scale from last to first place for this indicator.

CM
#99
#197#1
Trend

Change over time

Change in indicator over the available period.

0.00
1950
0.15
1990
0.25
2000
0.30
2010
0.35
2020
2.00
2025
0.35
2026

Values — GW

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Hydropower installed capacity in Cameroon — how much?
Based on 2026 data — 0.35 GW. This is rank #99 out of 197 countries.
What is Cameroon's rank by Hydropower installed capacity?
Cameroon ranks #99 out of 197 countries in the world ranking by «Hydropower installed capacity».
How has Hydropower installed capacity changed in Cameroon?
Over the available period the indicator changed from 0 to 0.35 GW.