Energy · Wind electricity generation

Wind electricity generation in Angola in 2026

In 2026, wind electricity generation in Angola was 0.2 TWh. The country ranked 104th out of 197 nations. The lack of generation is due to wind energy being in the pre-feasibility study stage in Angola. The most promising areas are the coastal regions of Benguela Province and the highlands of Huíla, where average annual wind speeds reach 7–8 m/s. However, the absence of government subsidies and low electricity tariffs from gas-fired plants make wind projects economically unviable at this stage.

Data for 2026 · unit: TWh
Position

Angola world ranking

#104 / 197

Country position on the scale from last to first place for this indicator.

AO
#104
#197#1
Trend

Change over time

Change in indicator over the available period.

0.0
1990
0.0
2000
0.0
2010
0.2
2020
0.2
2025
0.2
2026

Values — TWh

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Wind electricity generation in Angola — how much?
Based on 2026 data — 0.2 TWh. This is rank #104 out of 197 countries.
What is Angola's rank by Wind electricity generation?
Angola ranks #104 out of 197 countries in the world ranking by «Wind electricity generation».
How has Wind electricity generation changed in Angola?
Over the available period the indicator changed from 0 to 0.2 TWh.