Industry & Mining · Hydraulic turbine production

Hydraulic turbine production in Angola in 2026

Angola does not manufacture hydraulic turbines — in 2026 the figure was 0 units. Yet the country has enormous hydropower potential: the Capanda and Laúca dams on the Kwanza River are already operating, and the Caculo Cabaça project will be sub-Saharan Africa's largest hydro plant. All turbines for these stations are supplied by Chinese and Brazilian companies. Angola ranks 44 out of 197 globally.

Data for 2026 · unit: units
Position

Angola world ranking

#44 / 197

Country position on the scale from last to first place for this indicator.

AO
#44
#197#1
Trend

Change over time

Change in indicator over the available period.

0
1950
0
1990
0
2000
0
2010
1
2020
0
2025
0
2026

Values — units

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Hydraulic turbine production in Angola — how much?
Based on 2026 data — 0 units. This is rank #44 out of 197 countries.
What is Angola's rank by Hydraulic turbine production?
Angola ranks #44 out of 197 countries in the world ranking by «Hydraulic turbine production».
How has Hydraulic turbine production changed in Angola?
Over the available period the indicator changed from 0 to 0 units.