Energy · Hydropower installed capacity

Hydropower installed capacity in Angola in 2026

Angola's installed hydropower capacity reaches 3.80 GW. In 2026, the country ranks 41st out of 197 in the global ranking. Key hydroelectric plants are concentrated on the Kwanza River — the Capanda cascade and Lauca station provide the bulk of generation. The swift rivers of the central plateau and abundant rainfall during the wet season create favorable conditions for hydropower.

Data for 2026 · unit: GW
Position

Angola world ranking

#41 / 197

Country position on the scale from last to first place for this indicator.

AO
#41
#197#1
Trend

Change over time

Change in indicator over the available period.

0.00
1950
0.50
1990
0.60
2000
1.00
2010
3.50
2020
1.20
2025
3.80
2026

Values — GW

Related questions

People also search for

Other pages of the reference by this indicator.

Summary

Frequently asked questions

Hydropower installed capacity in Angola — how much?
Based on 2026 data — 3.80 GW. This is rank #41 out of 197 countries.
What is Angola's rank by Hydropower installed capacity?
Angola ranks #41 out of 197 countries in the world ranking by «Hydropower installed capacity».
How has Hydropower installed capacity changed in Angola?
Over the available period the indicator changed from 0 to 3.80 GW.